Cable Pulling Tension Calculator — Route Builder, Sidewall Pressure & Max Tension
Editable live calculator
Change any input — the result updates immediately
No hidden assumptions. Inputs, units and the working stay visible so you can check the calculation.
Calculated result
Pull reverse: 115.9 lbf final tension (forward 243.6 lbf)
Forward pull (cable fed in at section 1): 243.6 lbf final tension, 24.8 lbf/ft highest sidewall pressure
Reverse pull (cable fed in at section 4): 115.9 lbf final tension, 4.2 lbf/ft highest sidewall pressure
Reverse is the lower-tension direction: 127.6 lbf less at its highest point (52% lower).
Weight correction factor w = 1.0352 (three cables, triangular; d ÷ (D − d) = 0.2584).
Jam ratio D ÷ d = 4.87: very small probability of jamming (Cerrowire bands; the risk peaks between 2.8 and 3.0).
Allowable pulling tension: 5,078.4 lbf (pulling eye, copper conductors).
Highest tension: forward 5%, reverse 2% of the allowable.
Highest sidewall pressure: forward 5%, reverse 1% of the 500 lbf/ft limit.
Total bends between pull points: 90° (the NEC allows up to 360° for conduit).
Tension leaving each section
| Section | Forward tension | Forward sidewall | Reverse tension | Reverse sidewall |
|---|---|---|---|---|
| 1. Straight 150 ft | 91.3 lbf | – | 115.9 lbf | – |
| 2. Bend 90°, R 3 ft | 143.9 lbf | 24.8 lbf/ft | 24.6 lbf | 4.2 lbf/ft |
| 3. Uphill 40 ft at 30° | 207 lbf | – | 15.6 lbf | – |
| 4. Straight 60 ft | 243.6 lbf | – | 36.5 lbf | – |
Show the working
- 1. Cable weight W = 2.1 lb/ft; friction f = 0.28; w × f = 0.2898; back tension at the feed end 0 lbf.
- 2. Forward pull, section 1 to section 4:
- 3. Section 1, straight 150 ft: 0 lbf + 1.0352 × 0.28 × 2.1 lb/ft × 150 ft = 91.3 lbf.
- 4. Section 2, 90° bend: 91.3 lbf × e^(0.2898 × 1.5708 rad) = 143.9 lbf; sidewall pressure = 1.0352 × 143.9 lbf ÷ (2 × 3 ft) = 24.8 lbf/ft.
- 5. Section 3, uphill 40 ft at 30°: 143.9 lbf + 2.1 lb/ft × 40 ft × (sin 30° + 0.2898 × cos 30°) = 207 lbf.
- 6. Section 4, straight 60 ft: 207 lbf + 1.0352 × 0.28 × 2.1 lb/ft × 60 ft = 243.6 lbf.
- 7. Reverse pull, section 4 to section 1 (uphill and downhill swap):
- 8. Section 4, straight 60 ft: 0 lbf + 1.0352 × 0.28 × 2.1 lb/ft × 60 ft = 36.5 lbf.
- 9. Section 3, downhill 40 ft at 30°: 36.5 lbf − 2.1 lb/ft × 40 ft × (sin 30° − 0.2898 × cos 30°) = 15.6 lbf.
- 10. Section 2, 90° bend: 15.6 lbf × e^(0.2898 × 1.5708 rad) = 24.6 lbf; sidewall pressure = 1.0352 × 24.6 lbf ÷ (2 × 3 ft) = 4.2 lbf/ft.
- 11. Section 1, straight 150 ft: 24.6 lbf + 1.0352 × 0.28 × 2.1 lb/ft × 150 ft = 115.9 lbf.
- 12. Conductor limit = 0.008 lb/cmil × 3 × 211,600 cmil = 5,078.4 lbf.
- 13. Pulling-eye cap for two or more conductors: 10,000 lbf; allowable = 5,078.4 lbf.
Estimate only. Friction, the weight correction factor and the published limits are planning values: follow the cable manufacturer's maximum pulling tension, sidewall pressure and minimum bending radius for the cable you install. Vertical bends are treated as horizontal bends, which ignores the cable weight inside the bend.