MAXScanner calculator widget
Concrete Footing Calculator — Round, Square & Rectangular Footings
Editable live calculator
Change any input — the result updates immediately
No hidden assumptions. Inputs, units and the working stay visible so you can check the calculation.
Calculated result
0.576 yd³ concrete
2.3562 cu ft per round pier · 14.137 cu ft raw total
15.551 cu ft after allowance · 26 whole bags at 0.6 cu ft/bag
Bag price is optional.
Show the working
- 1. π × (0.5 ft)² × 3 ft = 2.3562 cu ft each
- 2. 2.3562 × 6 = 14.137 cu ft.
- 3. Apply 10% allowance → 15.551 cu ft = 0.576 yd³.
- 4. Bags = ceil(15.551 ÷ 0.6) = 26.
Concrete quantity only. Footing dimensions, reinforcement, frost depth and bearing requirements come from the actual structural/site design.
Shared links reopen these inputs; saved calculations stay in this browser unless you clear site data.