Formula & worked example
Q=m/ρ; D=sqrt(4Q/(πv)).
5,000 kg/h condensate at 950 kg/m³ and 1.5 m/s needs about 35 mm minimum internal diameter before schedule selection.
Help improve MAXScanner?
Optional usage analytics can tell us which tools and workflows are useful. File names, document contents, typed values, search queries and workflow tokens are not sent.
Plant engineering calculator · Updated Sep 17, 2026
Size a liquid condensate return line from mass flow, density and target velocity. Returns required internal diameter, volumetric flow and practical velocity checks in SI and US units.
Q=m/ρ; D=sqrt(4Q/(πv)).
5,000 kg/h condensate at 950 kg/m³ and 1.5 m/s needs about 35 mm minimum internal diameter before schedule selection.
Size a liquid condensate return line from mass flow, density and target velocity. Returns required internal diameter, volumetric flow and practical velocity checks in SI and US units.
Use it for screening, benchmarking and option comparison. Final selection should use measured conditions, manufacturer performance data and applicable engineering standards.
Plant calculations change materially with pressure basis, reference conditions, efficiencies and operating profile. Explicit assumptions make the result auditable instead of hiding those choices.