Formula & worked example
E≈0.00153·Q·ΔT(°C); D=Q·drift%; B=max(0,E/(COC−1)−D); M=E+D+B.
1,000 m³/h cooled by 10°C at 4 cycles gives about 15.3 m³/h evaporation before drift and blowdown.
Help improve MAXScanner?
Optional usage analytics can tell us which tools and workflows are useful. File names, document contents, typed values, search queries and workflow tokens are not sent.
HVAC & plant engineering calculator · Updated Sep 17, 2026
Calculate cooling-tower range, heat rejection, evaporation, drift, blowdown, makeup water and annual water use from circulation, temperatures and cycles of concentration.
E≈0.00153·Q·ΔT(°C); D=Q·drift%; B=max(0,E/(COC−1)−D); M=E+D+B.
1,000 m³/h cooled by 10°C at 4 cycles gives about 15.3 m³/h evaporation before drift and blowdown.
Calculate cooling-tower range, heat rejection, evaporation, drift, blowdown, makeup water and annual water use from circulation, temperatures and cycles of concentration.
Use it as an auditable engineering sizing cross-check. Final equipment and piping selections should use project design conditions, manufacturer data, applicable standards and local code.
Plant calculations are sensitive to fluid properties, pressure, temperature and operating hours. Exposing assumptions makes the result easier to verify instead of hiding them behind a single answer.