Why subtract the post volume?
The post occupies space inside the hole, so only the annular space around it is concrete.
Help improve MAXScanner?
Optional usage analytics can tell us which tools and workflows are useful. File names, document contents, typed values, search queries and workflow tokens are not sent.
MAXScanner calculator
Calculate concrete around round posts from hole diameter, post diameter, embedment depth and post count, then estimate bags.
Result
1,390 L concrete
1.39 m³ for 10 hole(s)
695 bag(s) at 2 L entered yield.
Concrete per hole = π × (hole radius² − post radius²) × depth; total = per-hole volume × post count.
A 12 in hole around a 4 in round post, 3 ft deep, uses the annular volume rather than treating the whole hole as concrete.
Last updated: 2026-09-16
The post occupies space inside the hole, so only the annular space around it is concrete.
This version models round post displacement; for square posts use the concrete volume as a conservative check or calculate square displacement separately.