Why subtract the post volume?
The post occupies space inside the hole, so only the annular space around it is concrete.
MAXScanner calculator
Calculate concrete around round posts from hole diameter, post diameter, embedment depth and post count, then estimate bags.
Result
593.07 L concrete
0.5931 m³ for 10 hole(s)
30 bag(s) at 20 L entered yield.
Concrete per hole = π × (hole radius² − post radius²) × depth; total = per-hole volume × post count.
A 12 in hole around a 4 in round post, 3 ft deep, uses the annular volume rather than treating the whole hole as concrete.
Last updated: 2026-09-16
The post occupies space inside the hole, so only the annular space around it is concrete.
This version models round post displacement; for square posts use the concrete volume as a conservative check or calculate square displacement separately.