Formula & worked example
B=S·Cf/(Cb−Cf); makeup≈S+B.
For 10 t/h steam, 200 ppm feedwater and 3,000 ppm boiler-water limit, blowdown is about 0.714 t/h.
Help improve MAXScanner?
Optional usage analytics can tell us which tools and workflows are useful. File names, document contents, typed values, search queries and workflow tokens are not sent.
HVAC engineering calculator · Updated Sep 17, 2026
Estimate continuous boiler blowdown from feedwater and boiler-water TDS limits, plus makeup requirement and approximate sensible heat carried by blowdown.
B=S·Cf/(Cb−Cf); makeup≈S+B.
For 10 t/h steam, 200 ppm feedwater and 3,000 ppm boiler-water limit, blowdown is about 0.714 t/h.
Estimate continuous boiler blowdown from feedwater and boiler-water TDS limits, plus makeup requirement and approximate sensible heat carried by blowdown.
Use it as an auditable engineering cross-check. Final selections should use measured design conditions, manufacturer data, applicable standards and local code.
HVAC shortcuts can hide density, pressure, concentration and effectiveness assumptions. Exposing them makes the result easier to verify and revise.