How to use this calculator
- Enter measured or design values using the units shown beside each field.
- Review the live results and the substituted calculation steps before using the estimate.
- Check the assumptions below, then continue to a related calculator when the next engineering decision needs another model.
Worked example
10 t/h steam, 7 t/h condensate return and 0.5 t/h blowdown require about 3.5 t/h makeup.
Assumptions and limits
- Mass balance assumes steady average operation.
- Include other drains, vents and intermittent losses separately when material.