How the materials are worked out
One cubic metre of M20 concrete (1:1.5:3) needs about 8.06 bags of 50 kg cement (403 kg), 0.42 m³ of sand (672 kg) and 0.84 m³ of 20 mm aggregate (1,260 kg), plus 202 litres of water at a water-cement ratio of 0.50. Those figures come from the usual site method: multiply the wet volume by a dry-volume factor of 1.54, split the result by the mix parts, then convert cement to bags and sand and aggregate to tonnes with bulk densities. Every one of those assumptions is visible below and can be changed, and the result is checked against the aggregate and water limits of IS 456:2000 Table 9 for M5 to M20.
How to use this calculator
Enter the volume of concrete, or the length, width and thickness of the slab or footing.
Pick a grade (M5 to M25) to load its nominal ratio, or choose a custom cement : sand : aggregate ratio.
Choose the cement bag sold where you build: 50 kg, 40 kg, 25 kg, 20 kg or 94 lb.
Open the assumptions to change the dry-volume factor, wastage, water-cement ratio or densities, then read the bags, sand, aggregate and water with the working.
Where people use it
- •Ordering cement, sand and aggregate for a roof slab, footing or floor that is mixed on site.
- •Checking a contractor’s material estimate for a house extension.
- •Converting a ratio such as 1:2:4 into bags and tonnes before visiting the supplier.
- •Comparing how much cement a richer mix (M20 instead of M15) adds to the bill of materials.
Example: 4 m × 3 m slab, 150 mm thick, M20
The volume is 4 × 3 × 0.15 = 1.8 m³. The dry volume is 1.8 × 1.54 = 2.772 m³, and the parts add up to 1 + 1.5 + 3 = 5.5. Cement is 2.772 ÷ 5.5 = 0.504 m³, or 725.76 kg, which is 14.52 bags of 50 kg: buy 15. Sand is 0.756 m³ (1.21 tonnes) and aggregate 1.512 m³ (2.27 tonnes). At a water-cement ratio of 0.50 the mix takes about 363 litres of water. The mix carries 239.6 kg of aggregate per 50 kg of cement, within the 250 kg limit that IS 456 Table 9 sets for M20.
Where a nominal mix is not enough
- •Nominal mixes are a fallback. IS 456:2000 prefers design mixes and allows nominal mixes only for M20 and lower, with the engineer’s permission. M25 at 1:1:2 is a site rule of thumb, not a code mix: structural concrete of M25 and above needs a design mix from a laboratory (IS 10262).
- •The 1.54 factor is an estimating convention for voids between the dry ingredients, not a value from any standard; published figures use anything from 1.52 to 1.57. Wet sand bulks, so measure sand by mass or correct for moisture.
- •Densities depend on the actual sand and stone. Replace the defaults with your supplier’s loose bulk density when you order by the tonne.
- •Ready-mix concrete is ordered by the cubic metre or yard, not by ingredients. Use the concrete volume calculator for that, and this page only when you mix on site.
Frequently asked questions
How many bags of cement are needed for 1 m³ of M20 concrete?+
About 8.06 bags of 50 kg (403 kg) with the usual 1.54 dry-volume factor and a 1:1.5:3 mix, so buy 9 for one cubic metre. With a factor of 1.52 it is 7.96 bags and with 1.57 it is 8.22, which is why published answers range from 8 to 8.3.
How do I calculate cement, sand and aggregate for M20?+
Multiply the wet volume by 1.54 to get the dry volume, then divide it by the sum of the parts (1 + 1.5 + 3 = 5.5). Cement is 1 part, sand 1.5 parts and aggregate 3 parts of that. For 1 m³: cement 0.28 m³ (403 kg), sand 0.42 m³ and aggregate 0.84 m³.
Why is 1.54 used in concrete calculation?+
Dry cement, sand and aggregate take up more room loose than after mixing with water and compacting, because the finer particles fill the gaps between the coarser ones. Multiplying by 1.54 (sometimes 1.52 or 1.57) turns the finished volume back into the loose volume you have to buy. It is a rule of thumb; change it if your contractor uses another value.
What is the mix ratio of M5, M7.5, M10, M15, M20 and M25?+
The usual site ratios are 1:5:10 for M5, 1:4:8 for M7.5, 1:3:6 for M10, 1:2:4 for M15, 1:1.5:3 for M20 and 1:1:2 for M25. IS 456 itself specifies nominal mixes by mass, as the maximum aggregate per 50 kg of cement: 800, 625, 480, 330 and 250 kg for M5 to M20. It has no nominal mix for M25.
How much water is needed for one bag of cement?+
At a water-cement ratio of 0.50, one 50 kg bag takes 25 litres. IS 456 Table 9 caps the water per 50 kg of cement at 30 litres for M20, 32 for M15 and 34 for M10, and Table 5 caps the free water-cement ratio of reinforced concrete at 0.55 in mild exposure and 0.50 in moderate exposure.
How many bags of cement are in a cubic yard of concrete?+
For a 1:2:4 mix with the 1.54 factor, one cubic yard needs 242 kg of cement: 5.68 bags of 94 lb, so 6 bags. A richer 1:2:3 mix needs 6.63 bags. Bagged premixed concrete is different: use the yield printed on the bag.
Semantic next steps
Continue the calculation
These links move to a different input, formula or project stage rather than a keyword variation of this page.
Concrete Calculator — Slab and Cylinder Volume
Estimate concrete volume for a rectangular slab or cylindrical pour in cubic feet, cubic yards and cubic meters, with an optional waste allowance.
Plaster Calculator: Cement and Sand for Walls
Cement bags and sand for cement plaster on walls and ceilings: area minus doors and windows, 6–20 mm thickness, 1:3 to 1:6 mix, with every factor shown.
Brick Calculator — Bricks, Mortar, Cement & Sand
Estimate bricks for one or more walls after opening deductions, then calculate wet and dry mortar, cement bags, sand volume and optional material cost from actual brick dimensions and mortar-joint inputs.
Concrete Block Calculator: CMU, Mortar & Cost
Count the concrete blocks for one or more walls after door and window openings and waste, then the mortar bags, pallets and optional cost from the real block face, joint and supplier pack data. Grout for the cores is worked out in the block fill calculator.
Concrete Footing Calculator — Round & Rectangular
Calculate concrete volume for round piers, square pads or rectangular/strip footings, multiply by quantity, add an editable allowance and round to whole premix bags from entered bag yield.
Rebar Calculator — Slab Grid, Bars, Weight & Cost
Build a two-direction slab rebar quantity from measured length, width, edge cover and spacing, then estimate total bar length, lap/waste allowance, stock pieces, optional weight and material cost.
Free publisher widget
Put this calculator on your website
Give readers the live calculator without rebuilding the math. Copy the responsive embed in one click, or customize width, height, border and corner radius before publishing. The branded MAXScanner attribution stays visible.
Calculator embed HTML
Paste this code into your page. Focus the code box to select it manually.
Keep the result connected to the real job
MAXScanner keeps the formula and assumptions beside the result so you can verify the number before using it in a drawing, estimate, specification, worksheet or document. Where a supplier, manufacturer, drawing or applicable standard owns a requirement, that source remains authoritative.