Sandbag Calculator: Bags and Sand for Flooding

How many sandbags and how much sand for a doorway, a wall or a ring dike: layers, pyramid base, bags per row, sand in m³, tonnes, cubic yards and short tons, plastic sheet and filling time.

Live calculationWorking shown

Sandbags · flood barrier plan

How many sandbags do you need?

Describe the opening or the wall and the water you expect. You get the bags, the sand to order, the plastic sheet and the hours of work.

What are you protecting?
Units

Run the wall past the frame so it meets the brickwork. Takamatsu Fire Bureau’s examples run 20–45 cm past each side.

Take the crest from the flood warning, not today’s level.

USACE adds half a foot (15 cm) to the forecast; NDSU asks for at least 1 ft (30 cm) on a river dike.

Bags and sand

Laid in the wall: 12 in along it, 10 in across, 4 in per layer.

Guidance runs from half full (Environment Agency) to two-thirds (USACE, German fire services). Overfilled bags leave gaps.

Our allowance for split bags, bags emptied to fit and a spare row. It is not a figure from the guidance.

Sandbags to fill

121 bags

105 in the wall + 5 to hold the sheet + 11 spare

A pyramid of 6 layers and 21 rows of 5 bags: 24 in high, 5.0 ft wide at the base.

Rows per layer, bottom first: 6, 5, 4, 3, 2, 1. Each row runs 4.7 ft.

Cross-section, water side on the left

Sand to order

1.48 m³ · 1.94 yd³ · 2.38 t · 2.62 short tons

Each bag holds about 12.3 L (0.43 ft³) and weighs about 19.6 kg (43.3 lb): 50.9 bags per tonne.

Filled bags on Euro pallets of 70 (1,200–1,400 kg each): 2.

Plastic sheeting

4.7 ft along the wall × 4.7 ft from 1 ft (30 cm) in front of it, up the water side and over the top: 22.0 ft².

Use polyethylene of 6 mil (0.15 mm) or more, lay it loosely, overlap joins by 3 ft (90 cm) with the upstream sheet on top, and never put plastic under the bags (NDSU).

Hours of work

2 people filling at 6 bags an hour each: about 10 h 5 min.

Carrying and laying at 40–60 bags per person per hour (LTV Sachsen): another 1 h 1 min to 1 h 31 min.

  • Above three layers the Environment Agency and USACE ask for a pyramid, so this plan is one.

This is a materials estimate. It does not replace instructions from your flood warning service, the fire service or the police: if you are told to leave, leave.

More actions

Shared links reopen these inputs. Recent and saved calculations stay in this browser unless you clear site data.

Runs in your browser. Nothing you type is uploaded.

Bags and sand for every 100 ft of wall

Freestanding pyramids of US: 14 × 26 in bags at their usual fill, dry sand, without the sheet row and the spare.

Height to holdLayersBase widthBagsSandDry sand
1 ft3 · 12 in2.5 ft6007.36 m³ (9.63 yd³)11.78 t (12.99 short tons)
2 ft6 · 24 in5.0 ft2,10025.77 m³ (33.70 yd³)41.23 t (45.45 short tons)
3 ft9 · 36 in7.5 ft4,50055.22 m³ (72.22 yd³)88.35 t (97.39 short tons)
4 ft12 · 48 in10.0 ft7,80095.71 m³ (125.19 yd³)153.14 t (168.81 short tons)

USACE’s own table gives 600, 2,100, 4,500 and 7,800 bags per 100 ft for 1 to 4 ft, the same as these rows.

Bag sizes compared

How each size sits in a wall and what it holds at its usual fill, with dry sand at 1,600 kg/m³.

BagIn the wall: along × across × layerUsual fillSand per bagBags per tonneSource
Europe: 30 × 60 cm47 × 27 × 10 cm (18.4 × 10.6 × 3.9 in)Two-thirds full12.5 L (0.44 ft³) · 20.0 kg (44.1 lb)50.0Landestalsperrenverwaltung des Freistaates Sachsen; Landesfeuerwehrschule Baden-Württemberg
US: 14 × 26 in30 × 25 × 10 cm (12.0 × 10.0 × 4.0 in)Half full12.3 L (0.43 ft³) · 19.6 kg (43.3 lb)50.9NDSU Extension; US Army Corps of Engineers, Northwestern Division
US: 14 × 24 in (USACE)30 × 25 × 10 cm (12.0 × 10.0 × 4.0 in)Half full11.3 L (0.40 ft³) · 18.1 kg (40.0 lb)55.2US Army Corps of Engineers, Northwestern Division; NDSU Extension
Japan: 48 × 62 cm 土のう20 × 47 × 13 cm (7.9 × 18.5 × 5.2 in)60 % full (6割)12.5 L (0.44 ft³) · 20.0 kg (44.1 lb)50.0高松市消防局; 射水市; 国土交通省 近畿地方整備局

How high can a sandbag wall go?

  • A single row: three layers, about 1 ft (30 cm). USACE does not recommend more except as a barricade against a building; the Environment Agency asks for a pyramid above three layers.
  • Victoria’s State Emergency Service doubles the row to two bags wide once a wall goes above five bags.
  • A pyramid: one more row at the base for every layer, which makes the base 2.5–2.7 times the height with US and European bags. NDSU, quoting USACE, and the Environment Agency give it as three times the height.
  • Above about 3 ft (0.9 m): NDSU asks for a bonding trench under the wall and the Environment Agency for an engineer’s design.
  • Against a building: GOV.UK advises a structural engineer above 600 mm of water and says resistance measures generally only work below 1 m. The Baden-Württemberg fire service school warns that a basement kept dry against high water can be pushed in or lifted.
  • This page stops at 2 m (6.5 ft), where the LFS-BW tables end.

Why sandbag walls leak or fail

  • Seepage. Water passes between and through the bags; a sheet on the water side and a pump behind the wall handle it.
  • Overtopping. The water rises past the forecast. Keep the margin and watch the warnings while you build.
  • Sliding. A wall holds by friction: clear ice, snow and slippery ground first, and never lay plastic under the bags.
  • Toppling. A single row has no width to resist a current, waves or floating logs; USACE keeps single stacks to still water.
  • Boils. Water forced under a levee can come up behind it carrying soil. Ring the boil, do not cap it.
  • Rot. Hessian bags perish if left damp; store them empty and dry, and treat bags that stood in floodwater as contaminated.

Filling and laying the bags

  1. Fill half to two-thirds full, two people per bag: one holds it open, one shovels.
  2. Do not tie the bag. Fold the open end under the filled part as you lay it.
  3. Clear debris, then lay bags lengthwise, parallel to the flow, starting at one end.
  4. Offset each layer by half a bag, like bricks, so no joint runs straight through.
  5. Tread each bag flat as you go; it closes the gaps and stops the next layer slipping.
  6. Lay the sheet loosely over the water side and hold its foot down with a row of bags.
  7. Wear gloves and boots, lift with your legs and change jobs often. Floodwater carries sewage.

Official flood warnings

Sandbags are not a substitute for official flood instructions. Check your national warning service and follow the fire service, police or council: if they tell you to leave, leave.

Sources: US Army Corps of Engineers, Northwestern Division, Sandbagging Techniques (2004); NDSU Extension, Sandbagging for Flood Protection (AE626) (reviewed 2023); Environment Agency, Sandbags and how to use them properly for flood protection (2009); Landestalsperrenverwaltung des Freistaates Sachsen, Sandsackstapeln – Richtig gemacht! (2018); Landesfeuerwehrschule Baden-Württemberg, Hinweise zum Einsatz von Sandsäcken bei Hochwasser (2014); Victoria State Emergency Service, Sandbagging: protecting your home; 高松市消防局, 土のうによる水害対策; 射水市, 土のうの作り方; 国土交通省 近畿地方整備局, 土のう造成機; Bureau of Indian Standards, IS 875 (Part 1):1987, Table 1 (dry sand 1,540–1,600 kg/m³) (1987); GOV.UK, Preparing a flood risk assessment: standing advice (2026); GOV.UK, How to prepare for flooding (2023); US Army Corps of Engineers, Flood Fighting Techniques. Guidance read on November 18, 2026.

How the bags and the sand are counted

A 1 m doorway with 50 cm of water expected needs about 128 sandbags of the common European 30 × 60 cm size and 1.6 m³ (2.56 t) of dry sand to fill them two-thirds full. The 15 cm safety margin USACE adds makes the wall 65 cm high, which takes 7 layers, and above three layers the Environment Agency and USACE both ask for a pyramid: 112 bags in the wall, 4 to pin down the plastic sheet and 12 spare. The same doorway takes 160 US 14 × 26 in bags or 141 Japanese 48 × 62 cm 土のう, because each size covers a different length of wall and layer height. Type your opening or wall, the depth the flood warning forecasts and your bags to get the rows, layers, sand in m³, tonnes, cubic yards and short tons, the sheet to buy and how long the filling takes. It is a materials estimate from published sandbagging guidance; it does not replace what your flood warning service tells you to do.

How to use this calculator

1

Choose what you are protecting: a doorway or gate, a length of wall or dike, or a ring around a sand boil.

2

Type the width of the opening or the length of the barrier, and the water depth in the flood forecast rather than today’s level.

3

Keep or change the safety margin and, at a doorway, how far the bags run past each side of the frame.

4

Pick the bag size, how full you fill the bags and the kind of sand, then the number of people filling.

5

Read the bags, sand, sheet and hours, then print the plan or copy the link before you go to collect sand.

Where people use it

  • •A householder in a flood warning area working out how many bags and how much sand to collect for the front door and the garage.
  • •A volunteer crew leader turning 10 m of garden wall at the forecast crest into bags, tonnes of sand and a filling rota.
  • •A farmer ringing a sand boil behind a levee with bags, keeping the spacing USACE asks for and a spillway.

Example: 10 m of garden wall against 40 cm of water

With the 15 cm margin the wall is 55 cm high, so 30 × 60 cm bags at 10 cm a layer need 6 layers. As a pyramid that is 21 rows, 1.62 m wide at the base. Each row on 10 m takes 22 bags: 462 in the wall, 22 more along the foot of the plastic sheet and 49 spare, 533 in all. Filled two-thirds, every bag holds 12.5 L, so the order is 6.66 m³ of sand, 10.66 t of it dry. The sheet is 10 m long and 1.48 m wide. Six people with shovels at 25 bags an hour each fill them in about 3 h 33 min.

What a sandbag plan cannot promise

  • •Sandbags slow water down; they do not seal. The Environment Agency notes that even well-stacked, trodden bags seep, so plan for a pump and move what matters upstairs.
  • •This is a materials estimate from published rules of thumb. It does not check that a wall will stand: running water, waves, floating debris, soft or icy ground and long floods all bring walls down.
  • •At a building, GOV.UK advises a structural engineer before you try to keep out more than 600 mm of water, and says resistance measures generally work only below 1 m: deeper water pushing on one side can damage the walls.
  • •Bag figures are averages from the sources: European numbers come from the LTV Sachsen table, Japanese ones are derived from Takamatsu and Imizu city guidance, and the 14 × 26 in bag is scaled from NDSU’s 14 × 24 in figure. Measure one of your own filled bags and use “My own bag” if yours differ.
  • •A wall across the door does nothing for water coming up through drains, toilets and air bricks. Block those too.
  • •Sand from bags that stood in floodwater is contaminated. Ask your council how to dispose of it.

Frequently asked questions

How many sandbags do I need for a door?+

The Environment Agency says at least 6 bags for 20 cm of water at a standard door: two layers of three. For 50 cm at a 1 m door the wall goes above three layers and becomes a pyramid, about 128 European 30 × 60 cm bags with the margin, the sheet and the spare.

How many sandbags does it take to build a wall?+

USACE counts 600, 2,100, 4,500 and 7,800 bags per 100 ft of levee for 1, 2, 3 and 4 ft of height. The LTV Sachsen table gives 21, 64, 129, 214, 321 and 450 bags per 10 m for 1 to 6 layers of 10 cm. Height drives the count: a pyramid needs as many rows at the base as it has layers.

How much sand do I need to fill sandbags?+

A cubic metre of sand fills about 80 European bags at two-thirds full, 12.5 L each. NDSU counts about 67 half-full 14 × 24 in bags per cubic yard, or 100 bags of 30 lb. Dry sand weighs about 1,600 kg/m³, so one tonne fills about 50 of those European bags.

How much does a filled sandbag weigh?+

Usually 15 to 20 kg. LTV Sachsen and Takamatsu Fire Bureau both give 15–20 kg, the Environment Agency about 15 kg, and NDSU suggests 35–40 lb for easy handling. Wet sand weighs more, up to about 2,082 kg/m³ against 1,600 kg/m³ dry.

How high can you stack sandbags?+

A single row is for three layers, about 1 ft or 30 cm. Above that, build a pyramid with a base 2.5 to 3 times the height. NDSU asks for a bonding trench above about 3 ft, and the Environment Agency says a tall wall must be designed by engineers.

How long does it take to fill sandbags?+

The Environment Agency allows about an hour for two people to fill 12 bags. German fire service guidance counts 50 bags an hour for two helpers with shovels and 100 with a funnel, and the sandbag machine of Japan’s MLIT fills 400 bags of about 15 kg an hour.

Should sandbags be tied?+

No. USACE and the Baden-Württemberg fire service school fold the open end under the bag; a tied, overfilled bag leaves gaps. Tie only bags that are thrown or carried loose on a truck.

Do sandbags keep all the water out?+

No. Even well-laid bags seep. A polyethylene sheet on the water side, weighed down along its foot, cuts the seepage, and a pump deals with the rest.

Semantic next steps

Continue the calculation

These links move to a different input, formula or project stage rather than a keyword variation of this page.

Free publisher widget

Put this calculator on your website

Give readers the live calculator without rebuilding the math. Copy the responsive embed in one click, or customize width, height, border and corner radius before publishing. The branded MAXScanner attribution stays visible.

Preview

Calculator embed HTML

Paste this code into your page. Focus the code box to select it manually.

Keep the result connected to the real job

MAXScanner keeps the formula and assumptions beside the result so you can verify the number before using it in a drawing, estimate, specification, worksheet or document. Where a supplier, manufacturer, drawing or applicable standard owns a requirement, that source remains authoritative.