Work and study planning
Use the result as a check within this type of task, with the assumptions shown above.
MAXScanner Calculator
Estimate project workdays and finish date from total work hours, daily capacity and one to seven scheduled work days per week.
Change the values and see the calculation update immediately.
The relationship behind the answer stays visible on the page.
Rates, dimensions and limitations are kept explicit instead of hidden.
Move into the next genuinely different calculation without keyword-copy pages.
Change any assumption; the calculation updates immediately.
Calculated plan
10 workdays · 2026-11-13
| Capacity | Workdays | Finish |
|---|---|---|
| 4 h/day | 20 | 2026-11-27 |
| 6 h/day | 14 | 2026-11-19 |
| 8 h/day | 10 | 2026-11-13 |
| 10 h/day | 8 | 2026-11-11 |
Shared links reopen these inputs. Recent and saved calculations stay in this browser unless you clear site data.
Planning results follow only the schedule and capacity assumptions entered above. Holidays, leave, interruptions and individual performance are not inferred unless the calculator explicitly includes them.
Project Duration Calculator turns the schedule and capacity values you enter into a planning estimate. It does not guess holidays, leave, local labor rules or interruptions that are not represented in the inputs.
Enter the schedule or workload values shown.
Set the work/study days, breaks, rates or thresholds that apply.
Review the result and the assumptions displayed beside it.
Use the result as a check within this type of task, with the assumptions shown above.
Use the result as a check within this type of task, with the assumptions shown above.
Use the result as a check within this type of task, with the assumptions shown above.
No, unless a specific calculator provides a holiday input.
No. Overtime calculations use the threshold or multiplier you enter and do not determine legal entitlement.
Yes. Those planning calculators allow one to seven scheduled days per week.
Use the calculator library to switch tasks when the question, unit or assumption changes.
Browse all calculatorsPlanning notes
Project Duration treats entered hours/day as productive capacity assigned to this project, rounds the required number of scheduled workdays upward, and exposes the partial load on the final day rather than pretending every final day is full.
An 80-hour project at 8 productive hours per scheduled workday needs 10 workdays. Starting Monday 2026-09-14 on a Monday–Friday pattern places the tenth scheduled workday on Friday 2026-09-25.
A project requiring part of an additional scheduled day still occupies that workday in this simple planning model.
For a Monday–Friday pattern, counting begins on the next scheduled workday.
Only when the entered work-days-per-week pattern includes them.
Method/editorial reviewed 2026-09-18. The live calculator inputs and visible working remain the source of truth for the exact scenario above.
These calculators share this task context and lead to a genuinely different calculation.